Phukot Karnali PRoR Hydro Electric Project (PKHEP) is located in Kalikot district, Karnali Province of Nepal. The project will use the flow from the Karnali River for power generation, and the generated power will be fed into integrated power system of Nepal at the nearest grid substation proposed at Regil.

The installed capacity of the project is 480 MW including 6 MW from the plant at toe of dam from the environmental release with a total energy of 2447 GWh. The gross head of the project is 168.62 m and the design discharge is 348m3/s.

Salient Features

S. No

Parameters

Details

1

General

 

 

Project Name

Phukot Karnali Hydro Electric Project

 

Location

Karnali Province, Kalikot District

 

Co-ordinates of the Project Area

291903” N to 290932” N latitude,

 

 

814500” E to 813528” E longitude

 

Nearest Highway

Karnali Highway

 

 

Nearest All Weather Airport

Surkhet Airport - 160 km from project site

 

 

Alternative  All Weather Airport

Nepalgunj Airport – 260 km from project

site

 

River

Karnali

 

Climate

Moderate

2

Organization

 

 

Developer

Vidhyut Utpadan Company Ltd.

 

Consultant

NEA Engineering Company Ltd.

3.            Hydrology

 

Catchment Area

16,902 km2

 

Mean Annual flow

328 m3/s

 

Maximum Monthly Discharge

881.50 m3/s

 

Minimum Monthly Discharge

77 m3/s

 

Design Discharge

348 m3/s

 

1 in 100 years flood (Q100)

3,648 m3/s

 

1 in 1000 years flood (Q1000)

4,813 m3/s

 

1 in 10,000 years flood (Q10,000)

5,956 m3/s

 

Probable Maximum Flood (QPMF)

15,882 m3/s

4.           Reservoir

 

Gross storage volume

79.78 Mm3

 

Live storage volume upto 904 masl

14.29 Mm3

 

Surface area at FSL

2.51 km2

 

Storage required for 6 hours peaking

7.52 Mm3

 

Length of Reservoir at FSL

11 km

 

Dry Season Full Supply Level

910 masl

 

Minimum Draw Down level

904 masl

5.            River Diversion Works

 

Diversion Discharge

2,777 m3/s (1 in 20 years flood)

 

Number of Tunnels

2 Nos.

 

Size and Shape

11 m diameter Circular shape

 

Lining

Concrete Lining

 

U/S Coffer Dam

 

 

Location

235 m u/s from Dam Axis

 

Height

36 m

 

Top Length

145 m

 

D/S Coffer Dam

 

 

Location

375 m d/s from Dam Axis

 

Height

8.5 m

 

Top Length

100 m

6.

Sediment By-Pass Tunnel

 

 

Location

775 m U/S from Dam axis

 

Number of tunnel

1 No.

 

Size and Shape

11 m diameter Cirular

 

Length

651m

9.            Dam

 

Type of Dam

Roller Compacted Concrete (RCC)

 

 

Location of Dam

Approx. 1.5 km D/S from Sanigad

Confluence

 

Dam length at top

313 m

 

 

Dam Height

109 m from River Bed

160 m from Foundation Bed

 

Top Width

10.0

 

Dam Top elevation

915.00 masl

10.          Spillway

 

Overflow Spillway

 

 

Type

Ogee and gated

 

Crest elevation

891 masl

 

Number and Size of gates

3 Nos., 13.5 m x 22.0 m (B X H)

 

Energy Dissipation

Flip Bucket

 

Sluice Spillway

 

 

Type

Ogee

 

Crest elevation

860 masl

 

Number and Size

3 Nos. , 7 m x 13 m(B X H)

 

Energy Dissipation

Flip Bucket

 

Trash Overflow Spillway

 

 

Type

Ogee

 

Crest elevation

902.5 masl

 

Number and Size

1 No. , 4m X 3 m

 

Energy Dissipation

Flip Bucket

11.          Power Intake

A

Main Power Intake

 

 

Type of Intake

Side intake

 

Number and Size of Trashrack openings

8 Nos., 4.8 m x 28 m (BXH)

 

 

Number and Size of Intake Gate

2 Nos., 8.4 m x 8.4 m (BXH) vertical lift

gate

 

Dry Season Design Discharge

348 m3/s

 

Wet Season Design Discharge

361 m3/s

 

Environmental Riparian Release

7.7 m3/s

 

Invert Level

883 masl

 

Deck Level

915 masl

 

Trash rack

Inclined at 80⁰ with horizontal

B

For Environment Release PH

 

 

Type of Intake

Embedded in dam

 

Number and Size of Trashrack opening

1 No., 3.8 m x 3.1 m (BxH)

 

Number and size of Intake Gates

1 No., 2.1 m x 2.1 m

 

Invert Level

883 masl

 

Design Discharge

7.7 m3/s

 

Trash Rack

Vertical

12.         Headrace Tunnel

 

Number

2 Nos.

 

Size and Shape

8.4 m Diameter Circular shape

 

Length

5831.66 m and 5597.20 m

 

 

Lining

300 mm thick Reinforced Concrete

Circular Lining

 

Maximum velocity

3.3 m/s

13.         Surge Tunnel

 

Type

Surge Tunnel (Slope: 1V:10H)

 

Number

2 Nos.

 

Length

764.10 m and 773.64 m

 

Diameter

8.0 m circular

 

Upsurge level

924.28 masl

 

Downsurge level

883.59 masl

14.         Pressure Shaft and Tunnel

 

Number

2 Nos.

 

Orientation

Vertical and horizontal

 

 

Diameter

6.5 m diameter circular (main), 5.3 m

and 3.75 m (after bifurcation)

 

Total Length

408.54 m & 520.32 m

 

Lining

Steel Lining (20 mm to 40 mm) for both

15.         Powerhouse

 

Main Powerhouse

 

 

Type

Underground

 

Installed Capacity

474 MW

 

Cavern Size

156 m X 20 m X 44.6 m (L X B X H)

 

Number and capacity of units

6 Nos. x 79 MW

 

Type of Turbine

Francis, Vertical Axis

 

Normal Tail water level

741.38 masl

 

Gross Head

168.62 m

 

Rated Net Head

159.60 m

 

Machine Floor Level

742.54 masl

 

Generator Floor Level

737.94 masl

 

Turbine Floor Level

733.64 masl

 

Turbine Center Line Level

731.74 masl

 

Powerhouse for Environmental Release

 

 

Type

Surface

 

Installed Capacity

6 MW

 

PH Size

37.15 m X 10.5 m X 15.85 m (L X B X H)

 

Number and capacity of units

2 Nos. x 3 MW

 

Type of Turbine

Francis, Horizontal Axis

 

Normal Tail water level

815 masl

 

Gross Head

95 m

 

Rated Net Head

88.88 m

 

Machine Floor Level

813.70 masl

 

Generator Floor Level

813.70 masl

 

Turbine Floor Level

813.7 masl

 

Turbine Center Line Level

815.60 masl

16.         Tailrace Tunnel

 

Number

2 Nos.

 

Size and Shape

9.5 m Diameter Circular shape (Finished)

 

Lining

500 mm thick Concrete Circular Lining

17.          Energy

 

Wet Season Energy

1703.8 GWh/yr

 

Dry Season Peak Energy

481.05 GWh/yr

 

Dry Season Off Peak Energy

263.75 GWh/yr

 

Dry Season Total Energy

744.79 GWh/yr

 

Total annual energy

2447.88 GWh

18.          Transmission line

 

Connection Length

2.3 km appox

 

Voltage

400 kV

19.          Construction period                                                  5 years

20.          Project cost

 

Exchange rate

(1 US$ = NRs. 116.57)

 

Total (before IDC)

82,210,013    (amount in 000)

 

Total financial (after IDC)

92,300,000    (amount in 000)

 

Specific project cost (financial)

192,292       (amount in000)

21.          Financial and economic indicators

 

Interest rate

11 %

 

IRR

13.53 %

 

EIRR/ROE (Return on Equity)

16.72 %

 

NPV

24,467,165 NRs.

 

B/C

1.37

 

Payback Period -Simple

5.96 Years

 

Payback Period - Discounted

8.95 Years